View Single Post
  #9  
Old 01-12-2020, 10:51 AM
Zman's Avatar
Zman Zman is offline
Platinum Level Site Supporter
 
Join Date: Apr 2010
Location: Burbs of Chicago
Posts: 1,818
Default

I set the squish at 1mm ~ 0.040 inches and I finished up the engine assembly last night. I put a quick coat of high heat clear on the bare aluminum parts so they stay cleaner. We are going to run this one without the 1cm reed cage spacer for even more low end torque and throttle response.
Attached Images
File Type: jpg GG144 big bore.jpg (124.9 KB, 10 views)
File Type: jpg GG 144 head.jpg (125.1 KB, 10 views)
File Type: jpg GG144 engine.jpg (128.1 KB, 15 views)
File Type: jpg GG EC144 Engine.jpg (126.8 KB, 14 views)
Reply With Quote