View Single Post
  #4  
Old 02-10-2020, 11:49 AM
Hooligan Hooligan is offline
Member
 
Join Date: Aug 2014
Posts: 68
Default

Quote:
Originally Posted by swazi_matt View Post
should be on the forum in one of the kyb threads, but the ones i remember was welding a tab on the steering head (like the yz have) and the other was door-stop rubbers screwed into the bike frame where the tubes come in contact, and the last being what you mentioned and what i had
Bolted everything together just to see how it all mates together and it seems the lower triple clamps will hit the rads first. With the triple touching the rad, there is a fair bit of distance to reach the frame and not really anything to bump off.

At this point, I'm thinking a tab welded on to the front of the steering head would be the best solution.
Reply With Quote