View Single Post
  #1  
Old 03-31-2016, 09:03 PM
RockefellerGG RockefellerGG is offline
Senior Member
 
Join Date: Mar 2015
Location: Raleigh, NC
Posts: 238
Default Complete Rebuild - EC250

I haven't seen a complete rebuild or walk through on the forum. Maybe I didn't search hard enough. Maybe this will be over-simplified, but I thought it might help someone who needed some motivation or confidence booster.

This EC250 belongs to a friend and fellow forum member. He was riding it a few weeks ago when the engine seized up. While washing it down, he noticed that the carb-to-air boot was disconnected. Here it goes:

Tonight, I'll start with the top end:

I started by removing the water pump cover:


The water pump impeller was seized to the bolt:


Gently pried out the shaft seal:


Remove the clutch cover:


Remove the right side power valve cover:


Removed the kick start lever:


Removed the shifter:


Remove the 6 bolts that hold the right side cover on. Gently pull that cover off:


Removed the lower nut that retains the power valve lever arm:


Removed the upper nut that retains the power valve lever arm:

Last edited by RockefellerGG; 07-13-2017 at 04:11 PM.
Reply With Quote