Thread
:
Keihin pwk 38mm gg ec 250
View Single Post
#
1
04-21-2014, 06:46 PM
adddy
Member
Join Date: Apr 2014
Location: uk. wivilescombe, Taunton Somerset
Posts: 26
Keihin pwk 38mm gg ec 250
The mod for stream crossings is to root the breather pipes up to the air box whilst leaving the drain/over flow in the original down position. Question out of these 5 pipes is 4 of them a breather & 1 an over flow?
adddy
View Public Profile
Find all posts by adddy