The prep work is done, bike is ready... I duct taped / sealed my visor to keep the water from dripping onto my goggles. I went with roll-off. Rad shrouds are covered with panty hose to keep from plugging up. I have the skid plate all packed with foam. I'm running brand new Maxis IT on the rear and SI up front.
All I need to do is my part, I know the bike can get it done!
Thanks for all the replys and help. Look for a full report.
Thanks
__________________
Rick
99 EC 200
06 RM 250
AMA D36
375X
OTHG
375S
***Thanks for the support : Twin Air /O'Neil Racing / Race 100% / Matrix Concepts / ODI / Mika Metals
|